Chief Engineer’s Documentation 2 (Non-Tankers)

24.00$

Course Description

This is a detailed guide for the Chief Engineer to self-inspect his necessary Documentation.

This is part Two of a four-part series covering the entire Engine Room Documentation. Here, we will cover the following Sub-topics.

Subtopics

  • Pressure Test of Bunker Lines
  • Bunker Plan
  • Bulk carriers handling High H2S Bunkers
  • Testing of Various equipment and records
  • Oil Record Book Part 1
  • Planned maintenance system
  • Oily water Separator
  • Records as per Annex VI (Air pollution)
  • SECA Procedures
USABLE-LOGO-512-x-512.jpg