Engine Group

99.00$

Category

This group contains the following courses :

  • Engine Room 1: UMS Entry; Engine Control Room, Main and Emergency Switchboard; Engine Log books (Non-Tankers)
  • Engine Room 1: UMS Entry; Engine Control Room, Main and Emergency Switchboard; Engine Log books (Tankers)
  • Engine Room 2: Engine Room Workshop, Designated Hotwork Area, Purifier Room
  • Engine Room 3: Around Engine Room; Gray water management; Local maneuvering, LSA FFA, Emergency Escape routes, Sewage Plant, Incinerator (Non-Tankers)
  • Engine Room 3: Around Engine Room; Gray water management; COP Turbine Platform (T); Inert Gas System (T), IG O2 Analyzer (T); Local maneuvering, LSA FFA, Emergency Escape routes, Sewage Plant, Incinerator (Tankers)
  • Engine Room 4: Bottom Platform, Oily water separator, Sludge/Bilge Systems, Equipment and Machinery (Non-Tankers)
  • Engine Room 4: Bottom Platform, Oily water separator, Sludge/Bilge Systems, Equipment and Machinery (Tankers)
  • Engine Room 5: Steering Flat, Emergency Fire Pump, Hypermist System, Chemical Locker
  • Engine Room 6: Pre-Arrival Checks and Eleventh Hour checks (Non-Tankers)
  • Engine Room 6: Pre-Arrival Checks and Eleventh Hour checks (Tankers)
  • Engine Room 7: 22 checks in 5 Mins – Engine Room (A list of 22 handpicked Engine Room checks which will show you the condition of the vessel.)
  • Engine Room 8: Operational Tests in the Engine Room
  • Chief Engineer’s Documentation Checks 1 (Non Tankers)
  • Chief Engineer’s Documentation Checks 1 (Tankers)
  • Chief Engineer’s Documentation Checks 2 (Non Tankers)
  • Chief Engineer’s Documentation Checks 2 (Tankers)
  • Chief Engineer’s Documentation Checks 3 (Non Tankers)
  • Chief Engineer’s Documentation Checks 3 (Tankers)
  • Chief Engineer’s Documentation Checks 4 (Non Tankers)
  • Chief Engineer’s Documentation Checks 4 (Tankers)
USABLE-LOGO-512-x-512.jpg